Projects

BEST TECH AND ENGINEERING LIMITED
828 RADIAN TELESCOPIC STACKER FMG AUSTRALIA
- Mining industry: Iron mining Max. discharge height: 19 m
- Transported material: Iron Power Installation: 450 kW
- Capacity: 18.000 t/h Length of discharge boom: 50 m
Scope of works : Mechanical Erection and commissioning

PWH ( THAILAND ) CO.,LTD.
MAE-MOH UNIT 4-7 REPLACEMENT PROJECT : MMRP1
- การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย(กฟผ.) แม่เมาะ อ.แม่เมาะ จ.ลำปาง
- Scope of works : Mechanical Erection and commissioning

TPI POLENE PUBLIC CO.,LTD.
FUEL HANDLING COAL CONVEYOR SYSTEM LINE 4
Installed a coal conveyor system in Line 4 with a length of approximately 2 kilometers, with a total of 11 conveyor belt systems with a belt width of 800-1400 mm. and equipped with Pulse Jet Bag Filter technology to control air pollution.
Scope of works : Mechanical Erection and commissioning

KHAMKEUT SAEN OUDOM LIMITED.(Laos)
EARTH CONVEYOR SYSTEM LINE
EPC design, estimation, procurement, fabrication and installation of a 10-belt conveyor system with a belt width of 1200 mm, a capacity of 750 tons per hour of material handling and a belt length. Total 520 meters.

Electricity Generating Authority of Thailand (EGAT)
MAE-MOH POWER PLANT
Relocate and install conveyor systems It is a coal conveyor system with 2 lines.
Line S4 is approximately 1,800 meters long and belt width is 1600 mm. Line R5 is approximately 1,400 meters

MMD ASIS PACIFIC LTD.
MMD APPRON FEEDER MOBILE CRUSHER
Installed and responsible for the MMD Heavy Duty Apron Plate Feeder Mae-Moh mining phase 8, capacity of conveying 6500 tons of material per hour.
Scope of works : Mechanical Erection and commissioning

STONE ONE PUBLIC COMPANY LIMITED.
UPGRADE STONE CRUSHING PLANT 750 TPH
Design, build and install a stone crushing plant with a capacity of 750 tons per hour of material handling. Mineral Shredder and Conveyor System which has worked together with electrical engineering department and civil engineering

PITAK PALM OIL COMPANY LIMITED.
SIDE WALL CONVEYOR SYSTEM
EPC Design, build and install a palm oil plant with a capacity of 30 tons per hour of material handling. Conveyor System which has worked together with electrical engineering department and civil engineering

PREMIER SYSTEM ENGINEERING CO.,LTD.
HY4 GLOVE PRODUCTION LINE
Fabrication and install steel structures and machinery for the medical glove production line. With a total weight of 1500 tons, with a contract period of 8 months, there are 160 workers per day.
Scope of works : Mechanical Erection and commissioning

THAI JURONG ENGINEERING LIMITED.
NEXIF RATCH ENERGY RAYONG ( NRER )
Piping Works Fabrication ,Installation and commissioning.
Scope of works : Mechanical Fabrication ,Erection and commissioning

SCAFFOLDING SERVICE
MAE-MOH UNIT 4-7 REPLACEMENTPROJECT : MMRP1
Scaffolding installation design calculation service and rental service

SBANG ENGINEERING LTD.
GKBI NAKHONSAWAN BIO COMPLEX
Installation and commissioning Shin Nippon Machinery Steam Turbine 38 x 2 MW

THAI MEIDENSHA CO.,LTD.
MULTI BIOMASS COGENERATION PROJECT AT KPP FACTORY
Installation and commissioning Shin Nippon Machinery Steam Turbine 9 MW

SBANG ENGINEERING LTD.
Clean Biomass Electricity Power Plant – CBE ( PHITSANULOK )
Installation and commissioning Triveni Steam Turbine 4.9 MW

SBANG ENGINEERING LTD.
RUNGTIWA BIOMASS SONGKHLA
Installation and commissioning Triveni Steam Turbine 9.9 MW

ADVANCE ENERGY DEVELOPMENT CO.,LTD.
VSPP-MSW KRABI
Installation and commissioning HTC Steam Turbine 6 MW

ADVANCE ENERGY DEVELOPMENT CO.,LTD.
Khlong Khlung Clean Energy Power Plant
Installation and commissioning HTC Steam Turbine 9 MW

SBANG ENGINEERING LTD.
Clean Biomass Electricity Power Plant – CBE ( PICHIT )
Installation and commissioning Triveni Steam Turbine 4.9 MW